Azerbaijan Railways talks on Aghdam-Khankandi railway line progress
Infrastructure
- 06 January, 2026
- 14:05
Add Report.az to preferred Google sources
Stay up to date with the top news!
The design of the Aghdam-Khankandi railway line in Azerbaijan is 81% complete, with construction and installation work 29% complete, Report informs referring to Azerbaijan Railways.
The total length of the railway line is 28 kilometers, or 30.8 kilometers including sidings.
The project includes the construction of three stations – Asgaran, Khojaly, and a railway and bus station complex in Khankandi. In addition, 124 engineering structures are planned.
Latest News
21:13
Photo
Shavkat Mirziyoyev discusses energy projects with SOCAR and BP
Energy
21:00
Hurricane Trudy strengthens to 195 kph off Mexico's coast
Other countries
20:35
International coalition calls Armenia's hosting of COP17 a double standard
Foreign policy
20:20
Video
Video on Patriotic War shared on President Ilham Aliyev's social media accounts
Domestic policy
20:10
Ilham Aliyev congratulates National Paralympic Committee on 30th anniversary
Domestic policy
19:51
Celal Çiftçi publicly apologizes to Azerbaijan after being placed on wanted list
Foreign policy
19:37
Sweden to provide Ukraine with new $52.3 million aid package to support civilians during winter
Other countries
19:06
Azerbaijan readmits 52 people from European countries in September
Foreign policy
18:59
Photo
Azerbaijan, UAE discuss prospects for special forces cooperation
Military