SOCAR increases drilling operations by 26%
Energy
- 07 September, 2017
- 10:46
Add Report.az to preferred Google sources
Stay up to date with the top news!
Baku. 7 September. REPORT.AZ/ In January-August 2017, the State Oil Company of Azerbaijan Republic (SOCAR) has carried out drilling operations of length 93 646 m (except joint ventures and operating companies).
Report informs referring to SOCAR, 87 208 meters of these works refer to operation, 6 438 exploration.
Drilling works during the reporting period was 26% more compared to the same period last year.
10,184 meters of drilling works carried out during the eight months of 2017 were made in August.
10 130 meters of which were operational, the rest - exploration works.
In August 2017, construction of 6 wells completed and handed over to miners. Notably, 52 new wells were handed over in 2017.
Latest News
19:29
Sahiba Gafarova highlights Azerbaijan's digital achievements in Astana
Foreign policy
19:16
Georgian MP says Azerbaijan's victory guarantees peace in the region
Region
19:13
Daily Mail: Meghan Markle's father arrested in Florida on child sexual abuse material charges
Other countries
19:00
Bloomberg: US and Iran near breakthrough in talks to end conflict
Other countries
18:48
IRGC claims to have shot down 16th US drone over Qeshm island
Other countries
18:35
Milli Majlis committee endorses bill on Absheron offshore block
Energy
18:24
Photo
President Ilham Aliyev and First Lady Mehriban Aliyeva attend opening of Zangilan City Education Complex - Update
Domestic policy
18:21
Photo
Samir Karimoglu's film 'Torpağı sanı yaşayasan' screened at 6th Korkut Ata Film Festival
Cultural policy
18:17
President: In just six years, we have enabled nearly 100,000 people to return to Garabagh and East Zangezur
Domestic policy